Chu Kong Petroleum and Natural Gas Steel Pipe Holdings Limited
Stock Code 01938.HK
ExchangeHong Kong Stock Exchange
Listing DateFeb 10ᵗʰ, 2010
Lot Size1,000
| NO. | Project Name | Specification | Size | Qty(Tonne/KM) | Application | Year |
|---|---|---|---|---|---|---|
| 21 | Sour Oil/Gas Pipeline Project,Daleel Petroleum L.L.C., Oman | API 5L PSL2 | 8"×8.2mm | 10 | Sour Oil/Gas | 2015 |
| 22 | Southeast Asia Pipeline Project | API 5L PSL2 | 30"×15.88mm | 2600 | Sour Gas | 2014 |
| 23 | Flow line Pipes, PDO, Oman | ISO3183:2007 DEP31.40.20.37 | 4"×5.6/7.1mm | 200 | Sour Service | 2014 |
| 24 | Yibal 3RD Stage Depletion Compression Project, Larsen & Toubro Limited, Oman | ASTM A671-CC65 CL22 Sour Service | 30"×12.7/15.88mm 36"×19.05/20.62mm | 512 | Sour Oil/Gas | 2014 |
| 25 | Sek Areas Flowlines Project, Sweden | API 5L PSL2 | 20"×15.09mm | 2715 | Sour Oil | 2014 |
| 26 | Changqing Oil Field Project, SINOPEC, China | GB/T9711-2011 PSL2 | 16"×11mm | 268 | Sour Gas | 2014 |
| 27 | Uzbekistan Gas Project, Lukoil, Uzbekistan | API 5L PSL2 | 32"×15.88mm | 20521 | Sour Gas | 2014 |
| 28 | Sour Curde Oil Transmission Pipeline Project, Kuwait | API 5L44th edition(ISO 3183) | 4"×6.02mm 6"×7.11mm | 232 | Sour Oil | 2012 |
| 29 | Flow line Pipes, PDO, Oman | ISO3183:2007 DEP31.40.20.37 | 4"×5.6/7.1mm | 550 | Sour Service | 2012 |
| 30 | NIMR-G Development and Karim West Water Flood Project, Oman | ASTM A672 | 30"×9.53/17.48mm 36"×9.53mm 40"×10.31/20.62mm 42"×11.13mm | 700 | Pressure Vessel | 2012 |