Chu Kong Petroleum and Natural Gas Steel Pipe Holdings Limited
Stock Code 01938.HK
ExchangeHong Kong Stock Exchange
Listing DateFeb 10ᵗʰ, 2010
Lot Size1,000
NO. | Project Name | Specification | Size | Qty(Tonne/KM) | Application | Year |
---|---|---|---|---|---|---|
11 | 360536 TenneT 2GW HVDC Grid Connection Project (BALWIN 4), CB& I, TenneT, Germany | EN10225 | 500-2680×16-110mm | 8841 | Offshore Windmill Jacket | 2024 |
12 | Zawtika Development Project, Bundle Phase 3, PTTEP, Southeast Asia | API 2B | 450-3302× 10-75mm | 14099 | Structure | 2024 |
13 | Offshore Oil Transportation Project, Guangzhou Salvage, PTTEP, Southeast Asia | API 5L | 18"×20.6mm 3D/5D | 127 | Offshore Oil | 2024 |
14 | RIYAS NGL FRACTIONATION FACILITIES-PKG.1 & PKG.2, Saudi Aramco, Saudi Arabia. | ASTM A671、API 5L PSL2 | 28-60"×11-31.75mm | 5034.21 | Gas | 2024 |
15 | RLNG Integration Phase-II, BAPCO, Bahrain | API 5L PSL2 | 24"/32"× 12.7/15.88/22.23mm | 5176.19 | Gas | 2024 |
16 | Dongying Port 250,000-tonne Crude Oil Import Berth and Supporting Projects Pipeline Project from Port Landing Point to Crude Oil Storage Area, Sinopec Shengli Oil Construction Engineering Co., Ltd, China | JC-PL-SP-002 B版 | 48"×19.1/21.2mm | 6370.56 | Oil | 2024 |
17 | Gaviao Mateiro Poject, ENEVA S.A, Brazil | API 5L PSL2 | 18'×9.8mm | 2952 | Gas | 2024 |
18 | Amiral PKG 4 Project, Hyundai E&C, Saudi Aramco, Saudi Arabia | API 5L PSL2 ASTM A671 | 508-3048×9.53-30.96mm | 5753.42 | Oil/Gas | 2024 |
19 | Iseni Gas Delivery Project, Nigeria | API 5L PSL2 | 24'×22.23/23.83mm | 18041 | Gas | 2024 |
20 | Tuz Gölü Underground Gas Storage Expansion Project, CAMC- ICTAS JV, BOTAŞ, Turkey | API 5L 46th PSL2 | 30"/28'×41.9/39.02mm | 5048 | Gas | 2024 |