The project mainly constructs one 50,000-tonne container berth (the hydraulic structure is designed and constructed in accordance with the berthing of 100,000-tonne container ships), which can berth two 20,000-tonne container ships at the same time. The project meets the demand of container transport in the hinterland and reduces the transport cost at the same time. PCK supplied more than 14,000KM of spiral submerged arc welded pipes equipped with solvent-free epoxy marine heavy duty anti-corrosion coatings as piling pipes for the project.
Details of Delivery | |
Specification | JTS167-2018 |
Grade | Q355B |
Size | φ1000/1200×10-20mm |
Mill | SAWH |
Qty | 14344 Mt |
Service | Piling |
Year | 2023 |
External Coating | Solvent free epoxy marine heavy-duty anti-corrosion coating |
Internal Coating | / |