Chu Kong Petroleum and Natural Gas Steel Pipe Holdings Limited
Stock Code 01938.HK
ExchangeHong Kong Stock Exchange
Listing DateFeb 10ᵗʰ, 2010
Lot Size1,000
NO. | Project Name | Specification | Size | Qty(Tonne/KM) | Application | Year |
---|---|---|---|---|---|---|
191 | Hawiyah Unayzah Gas Reservoir Storage Project, Saudi Aramco, Saudi Arabia | API 5L PSL2 | 56"x 19.05/ 26.97mm | 8936 | Gas | 2020 |
192 | Approach Bridge Project, Poly Changda Engineering Co., Ltd., China | SY/T5040 | φ820~2440×8~20mm | 18752 | Protective Pipe | 2020 |
193 | EPCC of 20" Dia Linepipe of MARI FIELD to SNGPL QV-2, Pakistan | API 5L PSL2 | 20"×10.31mm | 25 | Oil/Gas | 2020 |
194 | Berri Downstream Pipeline Project, Saudi Aramco | API 5L PSL2 | 30"x12.7/15.88/17.5/ 19.05mm | 23919 | Offhsore Gas/Oil | 2020 |
195 | ExxonMobil Papua New Guinea Project, Papua New Guinea | AS 1163 | 18"/24"×12.7mm | 8 | Piling | 2020 |
196 | AlSharqiya Water Transportation System Upgrade Project, Oman | API 5L PSL 2 | 52" ×9.5mm | 6759 | Water | 2020 |
197 | Xuwei New District Standard Tail Water Drainage Project, China | GB3091-2015 | φ630~φ1820×10~20mm | 9595 | Water | 2020 |
198 | Vietnam Wind Power Project, China | JTS 167—2018 | φ1400/1700×20/25mm | 19589 | Windmill Jacket | 2020 |
199 | Oil Terminal Project in Eastern District of Bohe New Port Area of Maoming Port, China | GB/T1591-2018 | φ1000/1200×18/20mm | 12336 | Piling | 2020 |
200 | Threeway Steel Co., Ltd., China | API 5L PSL2 NACE MR0175 | 20"×11.12mm | 1226 | Sour Oil/Gas | 2019 |