Chu Kong Petroleum and Natural Gas Steel Pipe Holdings Limited
Stock Code 01938.HK
ExchangeHong Kong Stock Exchange
Listing DateFeb 10ᵗʰ, 2010
Lot Size1,000
NO. | Project Name | Specification | Size | Qty(Tonne/KM) | Application | Year |
---|---|---|---|---|---|---|
41 | Martinu Acid Gas Treatment Project, CNPC, China | API 5L 46th | 24"/28"×11.91/12.7mm | 3166 | Sour Gas | 2021 |
42 | Ajaokuta, Kaduna, Kano (AKK) Gas Pipeline Project, NNPC, Nigeria | API 5L PSL2 | 40"×18.25~27.63mm 5D | 170 | Gas | 2021 |
43 | Pan American Energy 24" Linepipe project, Argentina | API 5L PSL2 | 24"×12.7/15.88/19.05mm | 3668 | Gas/Oil | 2021 |
44 | Huizhou LNG terminal export pipeline project | API 5L PSL2 | 36"×17.5/20.6mm | 27669 | City Gas | 2021 |
45 | GDM Debottleneck Project-Phase 1, Bahrain acid resistant pipe project, Bahrain | API 5L PSL2 | 24"/28"/32"×20.2/22.3/23.8/25.4mm | 8951 | Sour Gas | 2021 |
46 | Vietnam Wind Power Project, China | JTS 167—2018 | φ1400/1700×20/25mm | 19589 | Windmill Jacket | 2020 |
47 | Xuwei New District Standard Tail Water Drainage Project, China | GB3091-2015 | φ630~φ1820×10~20mm | 9595 | Water | 2020 |
48 | AlSharqiya Water Transportation System Upgrade Project, Oman | API 5L PSL 2 | 52" ×9.5mm | 6759 | Water | 2020 |
49 | Oil Terminal Project in Eastern District of Bohe New Port Area of Maoming Port, China | GB/T1591-2018 | φ1000/1200×18/20mm | 12336 | Piling | 2020 |
50 | Approach Bridge Project, Poly Changda Engineering Co., Ltd., China | SY/T5040 | φ820~2440×8~20mm | 18752 | Protective Pipe | 2020 |