Chu Kong Petroleum and Natural Gas Steel Pipe Holdings Limited
Stock Code 01938.HK
ExchangeHong Kong Stock Exchange
Listing DateFeb 10ᵗʰ, 2010
Lot Size1,000
NO. | Project Name | Specification | Size | Qty(Tonne/KM) | Application | Year |
---|---|---|---|---|---|---|
71 | China Communications 2No Navgatinal 2No Engineering Co., Ltd. (CSNEC), China | JTS 167-4-2012 | Φ2000~3344×16~22mm | 13647 | Steel Casing/Piling | 2018 |
72 | Tiaoshun Island Sea-Crossing Bridge, China Railway Material Group South China | JTS 167-4-2012 | Φ1832~2944×16~22mm | 8980 | Piling | 2018 |
73 | Hainan Island-Loop Pipleline Network Wenchang-Qionghai-Sanya Gas Transportation Project, Jiangsu Yuanyang Pipe Industry Co., Ltd., China | GB/T9711-2017 PSL2 & Customer Standard | 24"×8/10mm | 12882 | Gas | 2018 |
74 | Phase I, E-An-Cang Gas Pipeline Project, Sinopec, China | Customer Standard | 48"×26.4mm 40"×21/26.2mm 28"×12.5/17.48/20mm | 49504 | Gas | 2018 |
75 | Oil Transportation Project, Shell, Iraq | API 5L PSL2 | 30"/40"/48"×10.31-17.48mm | 750 | Gas | 2018 |
76 | NNPC Trans Nigeria Gas Pipeline Project, Nigeria | API 5L PSL2 | 36"×21.8mm | 4197 | Gas | 2018 |
77 | Hainan Island-Loop Pipleline Network Project Section B, CNOOC, China | GB/T9711-2017 PSL2 & Customer Standard | 24"×12.5mm | 8869 | Gas | 2018 |
78 | Bangladesh Gas Transportation Project, China North Vehicle Corporation Ltd., Bangladesh | API 5L PSL2 | 36"×17.5mm | 19151 | Gas | 2018 |
79 | Zhanjiang Donghaidao-Leizhou High-speed Bridge Project, Guangdong Changda Highway Engineering Co., Ltd., China | JTS 167-4-2012 | Φ2644~3250×18~36mm | 10884 | Protective Pipe | 2017 |
80 | Phase III,Gas Pipeline for GMP New 12SPP Project, PTT & GULF, Thailand | API 5L PSL2 | 12"×10.31mm | 10.7 | Gas | 2017 |