Chu Kong Petroleum and Natural Gas Steel Pipe Holdings Limited
Stock Code 01938.HK
ExchangeHong Kong Stock Exchange
Listing DateFeb 10ᵗʰ, 2010
Lot Size1,000
NO. | Project Name | Specification | Size | Qty(Tonne/KM) | Application | Year |
---|---|---|---|---|---|---|
111 | Trans Nigeria Gas Pipeline Project, Nigeria | API 5L PSL2 | φ914×17.5mm | 5610 | Gas | 2022 |
112 | Shandong Natural Gas Pipeline Network East Trunk Line (Third Batch), China | SDDXT01GI003 #EMS-SPE-0101 | 32"×14.6mm 40"×30.18/33mm 48"×18.4mm | 6843 | Gas | 2022 |
113 | Yuzi Pipeline Eastern Gas Supply Project (first batch), Sinopec, China | DBQYT01GI003 #EMS-SPE-0001 | 40"×17.5/21mm | 4363 | Gas | 2022 |
114 | Tilenga Project, TOTAL, Uganda | API 5L PSL2 | 20"×11.91/14.27/15.09 /15.88mm | 5845 | Oil | 2022 |
115 | Shandong Natural Gas Pipeline Network East Trunk Line (Fourth Batch), China | SDDXT01GI003 #EMS-DL-2401 SDDXT01GI003 #EMS-DL-3801-0 SDDXT01GI003 #EMS-SPE-0101 | 24"×20.62mm 32"×14.6mm 32"/40"×25.4/26.2mm 48"×18.4mm | 14615 | Gas | 2022 |
116 | PROYECTO AMPLIACIÓN GASODUCTO GSP FASE II, YPFB, Bolivia | API 5L PSL2 | 10"×6.35/7.8mm | 11.5 | Oil | 2022 |
117 | Shandong Province Natural Gas Pipeline Network East Trunk Line (Fifth Batch), China | SDDXT01GI003 #EMS-SPE-0101 | 48"×18.4mm | 7500 | Gas | 2022 |
118 | Yantai Port Longkou Port Area South Operation Area General and Liquid Bulk Berth Project, CRCC, China | GB/T1591-2018 | φ1000×18/20mm | 9797.23 | Structure | 2022 |
119 | Al-Faw Grand Port Infrastructure Phase 1 Project, Daewoo, Iraq | EN10219-1 | φ1220/1420×25mm | 67898.88 | Piling | 2022 |
120 | Shenzhen Marine Emerging Industry Base Land Formation Project, Section 2a Construction Project, China | JTS167-2018 | φ1016×18mm | 9093 | Piling | 2022 |