Chu Kong Petroleum and Natural Gas Steel Pipe Holdings Limited
Stock Code 01938.HK
ExchangeHong Kong Stock Exchange
Listing DateFeb 10ᵗʰ, 2010
Lot Size1,000
NO. | Project Name | Specification | Size | Qty(Tonne/KM) | Application | Year |
---|---|---|---|---|---|---|
121 | PROYECTO AMPLIACIÓN GASODUCTO GSP, FASE II, YPFB, Bolivia | API 5L PSL2 | 10"×6.35/7.8mm | 11.5 | Oil | 2022 |
122 | Shandong Province Natural Gas Pipeline Network East Trunk Line (Fifth Batch), China | SDDXT01GI003 #EMS-SPE-0101 | 48"×18.4mm | 7500 | Gas | 2022 |
123 | Shell Crux Sub-Structure Project, Australia | BS EN 10225-2009 & Customer Standard | φ700~3760×15~100mm | 35747 | Offshore Jacket Leg/Piles | 2022 |
124 | Yulong Island Refinery-Chemical Integration Project (Phase I), Shandong Yulong Petrochemical Co., China | GB/T9711 PSL1 GB/T32970 钢管正火 | 24"×12.7mm 64"/88"×14/17.48mm | 3175 | Chemical Industry | 2022 |
125 | Bohe to Maoming Oil Pipeline Project, Sinopec, China | GB/T9711 PSL2 API 5L PSL2 | 28"×11.9/14.3/15.9mm 40"×15.88mm | 15321 | Oil | 2022 |
126 | Trans Nigeria Gas Pipeline Project, Nigeria | API 5L PSL2 | φ914×17.5mm | 5610 | Gas | 2022 |
127 | Shandong Province Natural Gas Pipeline Network East Trunk Line (Fifth Batch), China | SDDXT01GI003 #EMS-SPE-0101 | 48"×18.4mm | 7500 | Gas | 2022 |
128 | Shandong Natural Gas Pipeline Network East Trunk Line (Fourth Batch), China | SDDXT01GI003 #EMS-DL-2401 SDDXT01GI003 #EMS-DL-3801-0 SDDXT01GI003 #EMS-SPE-0101 | 24"×20.62mm 32"×14.6mm 32"/40"×25.4/26.2mm 48"×18.4mm | 14615 | Gas | 2022 |
129 | Tilenga Project, TOTAL, Uganda | API 5L PSL2 | 20"×11.91/14.27/15.09 /15.88mm | 5845 | Oil | 2022 |
130 | Shandong Natural Gas Pipeline Network East Trunk Line (Third Batch), China | SDDXT01GI003 #EMS-SPE-0101 | 32"×14.6mm 40"×30.18/33mm 48"×18.4mm | 6843 | Gas | 2022 |